MPI RESOLUTION

User avatar
Henk
Posts: 20560
Joined: Fri Jul 23, 2010 3:23 pm
Location: Breskens

MPI RESOLUTION

Post by Henk » Sat Sep 04, 2010 4:16 pm

MPI RESOLUTION
Wind Turbine Installatie
2009 - 2018
Resolution Shipping Ltd. (MPI Offshore Ltd.[Vroon BV]) - Limassol
Ordered October 2001; keel laid 13-05-2002; launched 02-10-2002; delivered 01-11-2003 by Shanhaiguan Shipyard - Shanhaiguan (TIV-1)
130,50 x 125,00 x 38,00 x 8,00 x 4,00 m
14.085 grt; 7.000 dwt
C.4.S.N.2. 9260134
2x 4SA 6 cylinder Wärtsilä type 6L20 & 2x viertakt V16 cylinder Mitsubishi type S16R each connected to a generator 1824 kW each connected to an electromotor 1.500 kW eac connected to an Azimuth propeller type AQM205; 4SA 6 cylinder Wärtsilä type 6L20 connected to a generator; 3 bowthrusters
10,5 knots
1 crane 300 tons
In the fleet In April 2009 renamed from RESOLUTION
Sold 09-08-2018 as MPI RESOLUTION to Van Oord Installatie Materieel I BV (Van Oord Offshore Wind BV) - Rotterdam

In July 2004 bought named MAYFLOWER RESOLUTION from Mayflower Energy (Marine Projects International Ltd.) - Douglas.
In October 2016 legs lengthend with 7 meters

Photo's: Henk de Winde
Attachments
MPI RESOLUTION @HenkdeWinde (23).JPG
MPI RESOLUTION @HenkdeWinde (05).JPG
Last edited by Henk on Mon Oct 15, 2018 6:39 pm, edited 3 times in total.
Henk de Winde

User avatar
Henk
Posts: 20560
Joined: Fri Jul 23, 2010 3:23 pm
Location: Breskens

Re: MPI RESOLUTION

Post by Henk » Mon Jan 27, 2014 3:28 pm

Pictured Wandelaar Pilot station 17-06-2013

Photo: Ronald Ribbe
Attachments
MPI Resolution© RIBBE (2).JPG
MPI Resolution© RIBBE (6).JPG
MPI Resolution© RIBBE (8).JPG
Henk de Winde

User avatar
Henk
Posts: 20560
Joined: Fri Jul 23, 2010 3:23 pm
Location: Breskens

Re: MPI RESOLUTION

Post by Henk » Thu May 22, 2014 3:19 pm

Pictured Wandelaar Pilot Station 19-04-2014

Photo: Ronald Ribbe
Attachments
MPI Resolution © RIBBE (5).JPG
Henk de Winde

Post Reply

Return to “Vroon Offshore”

Who is online

Users browsing this forum: No registered users and 5 guests